Violation Detail
Standard Cited: 19100119 J04 III Process safety management of highly hazardous chemicals.
Inspection Nr: 1170128.015
Citation: 01008
Citation Type: Serious
Abatement Date: 02/28/2017 2
Initial Penalty: $12,675.00
Current Penalty: $10,773.00
Issuance Date: 02/08/2017
Nr Instances: 3
Nr Exposed: 8
Related Event Code (REC):
Gravity: 10
Report ID: 0626600
Contest Date:
Final Order: 02/28/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/28/2017 | $10,773.00 | 02/28/2017 | Serious | |
Penalty | Z: Issued | 02/08/2017 | $12,675.00 | 02/28/2017 | Serious |
Text For Citation: 01 Item/Group: 008 Hazard:
29 CFR 1910.119(j)(4)(iii): The frequency of inspections and tests of process equipment was not consistent with applicable manufacturers' recommendations and good engineering practices, and more frequently if determined to be necessary by prior operating experience. On or about August 9th 2016 in the Multi-Purpose Unit at Arkema, Inc. located in Crosby, TX, the frequency of inspections and tests of process equipment was not consistent with applicable manufacturers' recommendations and good engineering practices, and more frequently if determined to be necessary by prior operating experience. Equipment includes but is not limited to: a) Sulfur Dioxide T-19 (P&ID CR 17-X-0017 Rev. D) b) Pipeline 1 ½-CP-1399-316L (P&ID CR-17-X-0017 Rev D) from 17-T-19 (Sulfur dioxide tank) to EH-4 (SO2 Vaporizer) ( P&ID CR-30-X-0021) c) Pipeline 1-P301009-P from Pump P-63A(P&ID CR-30-X-0012 Rev. D) to Heat Exchanger 31-EH-14 (P&ID CR-30-X-0100 Rev. B)