Violation Detail
Standard Cited: 19261204 C03
Inspection Nr: 1102251.015
Citation: 01008
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,800.00
Current Penalty: $1,400.00
Issuance Date: 04/11/2016
Nr Instances: 2
Nr Exposed: 2
Abatement Date: 08/08/2016
Gravity: 10
Report ID: 0524500
Contest Date: 04/28/2016
Final Order: 10/13/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 10/13/2016 | $1,400.00 | 08/08/2016 | Serious | |
Penalty | C: Contested | 05/02/2016 | $2,800.00 | 05/05/2016 | Serious | |
Penalty | Z: Issued | 04/11/2016 | $2,800.00 | 05/05/2016 | Serious |
Text For Citation: 01 Item/Group: 008 Hazard:
29 CFR 1926.1204(c)(3): The employer did not develop and implement the means, procedures, and practices necessary for safe permit space entry operations, including, isolating the permit space and physical hazard(s) within the space; On or about October 20, 2015, employees entered a confined space between the post aeration building and the diversion structure and the employer did not ensure the gate and associated structure was isolated and secured to prevent water from entering the space and creating a potential engulfment hazard.