Violation Detail
Standard Cited: 19100219 C04 I Mechanical power-transmission apparatus.
Inspection Nr: 1065706.015
Citation: 01008
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,380.00
Current Penalty: $1,428.00
Issuance Date: 10/07/2015
Nr Instances: 4
Nr Exposed: 8
Abatement Date: 11/03/2015
Gravity: 5
Report ID: 0418100
Contest Date:
Final Order: 11/13/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/13/2015 | $1,428.00 | 11/03/2015 | Serious | |
Penalty | Z: Issued | 10/07/2015 | $2,380.00 | 11/03/2015 | Serious |
Text For Citation: 01 Item/Group: 008 Hazard:
29 CFR 1910.219(c)(4)(i): Unguarded projecting shaft end(s) did not present a smooth edge and end and projected more than one half the diameter of the shaft. On or about 5/27/15, in the sawmill production area, the employer did not ensure shaft ends on equipment and conveyors projected less than one half the diameter of the shaft. Instances included: 1 Resaw Work Area inside covered area - Fast Moving Conveyor Equipment 5 x 2 opening 2 2nd instance in Resaw area 2x2 opening 3 Planer Mill Outfeed side (on other side of wall) 2x2 opening 4 - Outfeed side of Trim Saw In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).