Violation Detail
Standard Cited: 19100119 D03 I B Process safety management of highly hazardous chemicals.
Inspection Nr: 1013183.015
Citation: 01008
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $4,675.00
Current Penalty: $3,275.00
Issuance Date: 05/04/2015
Nr Instances: 5
Nr Exposed: 26
Related Event Code (REC):
Gravity: 5
Report ID: 0521100
Contest Date: 05/28/2015
Final Order: 06/08/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 06/08/2016 | $3,275.00 | Serious | ||
Penalty | C: Contested | 06/11/2015 | $4,675.00 | Serious | ||
Penalty | Z: Issued | 05/04/2015 | $4,675.00 | Serious |
Text For Citation: 01 Item/Group: 008 Hazard:
29 CFR 1910.119(d)(3)(i)(B): The employer's piping and instrument diagrams were not accurate and did not represent equipment that was existing and was part of the process: a) On or about December 15, 2014, P&ID ACS9912 incorrectly indicated Valve #1377 was located on the 3/4" HGD Drain Line. Valve #1377 is located on the 2" HGD Line. b) On or about January 2, 2015, P&ID ACS9912 incorrectly indicated the 2 1/2" LTRL line connects with 3/4" line containing Valves #1164 and #1155. The 2 1/2 " LTRL line and the 3/4" line containing Valves #1164 and #1155 do not connect. c) On or about January 7, 2015, P&ID ACS9912 incorrectly indicated a line with Valve #1152 connecting the ACC 10 Sight Column to the 3/4" pipe connecting V-15 Oil Pot to Pressure Relief Valve #1175. The line containing Valve #1152 also contains two T-junctions with 3/4" LTS lines and Valve #1528.