Violation Detail
Standard Cited: 19100219 C02 I Mechanical power-transmission apparatus.
Inspection Nr: 1011105.015
Citation: 01008
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,400.00
Current Penalty: $1,700.00
Issuance Date: 05/15/2015
Nr Instances: 2
Nr Exposed: 1
Abatement Date: 07/13/2015
Gravity: 5
Report ID: 0215800
Contest Date: 06/09/2015
Final Order: 08/31/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 08/31/2015 | $1,700.00 | 07/13/2015 | Serious | |
Penalty | C: Contested | 06/19/2015 | $3,400.00 | 06/19/2015 | Serious | |
Penalty | Z: Issued | 05/15/2015 | $3,400.00 | 06/19/2015 | Serious |
Text For Citation: 01 Item/Group: 008 Hazard:
29 CFR 1910.219(c)(2)(i): All exposed part(s) of horizontal shafting seven (7) feet or less from floor or working platform were not protected by stationary casing(s) enclosing shafting completely or by trough(s) enclosing sides and top or sides and bottom of shafting: a) Packing Area, Line 5, on or about 12/5/14: Two horizontal rotating shafts driving two separate conveyors near the metal detector station were not guarded. Abatement certification must be submitted for this item.