Violation Detail
Standard Cited: 19100218 F02 I Forging machines.
Inspection Nr: 1010588.015
Citation: 01008
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,500.00
Current Penalty: $3,000.00
Issuance Date: 05/19/2015
Nr Instances: 5
Nr Exposed: 5
Abatement Date: 06/15/2015
Gravity: 5
Report ID: 0522300
Contest Date: 06/11/2015
Final Order: 11/18/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 11/18/2015 | $3,000.00 | 06/15/2015 | Serious | |
Penalty | C: Contested | 06/16/2015 | $5,500.00 | 06/15/2015 | Serious | |
Penalty | Z: Issued | 05/19/2015 | $5,500.00 | 06/15/2015 | Serious |
Text For Citation: 01 Item/Group: 008 Hazard:
29 CFR 1910.218(f)(2)(i): Electrical power apparatus to hydraulic forging press(es) was not locked out when die(s) were being changed or maintenance was being performed on the press(es): On or about December, 9, 2014, the employer did not ensure the 5,000 ton hydraulic powered forging press was locked out when the dies were changed.