Violation Detail
Standard Cited: 19260062 I02 II Lead
Inspection Nr: 1288638.015
Citation: 01007E
Citation Type: Other
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/17/2018
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 07/27/2018
Gravity: 5
Report ID: 0317000
Contest Date: 07/27/2018
Final Order: 02/19/2019
Related Event Code (REC):
Emphasis:
Substance: BWPB
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 02/19/2019 | $0.00 | 07/27/2018 | Other | |
Penalty | C: Contested | 09/11/2018 | $0.00 | 07/27/2018 | Serious | |
Penalty | Z: Issued | 07/17/2018 | $0.00 | 07/27/2018 | Serious |
Text For Citation: 01 Item/Group: 007E Hazard:
29 CFR 1926.62(i)(2)(ii): The employer did not ensure that change areas were equipped with separate storage facilities for protective work clothing and equipment and for street clothes, that would prevent cross-contamination: (a) River Station Demolition Project, Downingtown, PA - On or about 1/17/18, the employer did not provide clean change areas with separate storage for protective clothing and street clothing as interim protection for employees performing cutting and torch burning of lead coated surfaces, exposing employees to chemical hazards.