Violation Detail
Standard Cited: 19100305 B02 Wiring methods, components, and equipment for general use.
This violation item has been deleted.
Inspection Nr: 109779.015
Citation: 01007D
Citation Type: Serious
Abatement Date: 03/27/2012
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/22/2012
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity: 10
Report ID: 0830600
Contest Date: 04/12/2012
Final Order: 01/09/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 01/09/2013 | $0.00 | 03/27/2012 | Serious | |
Penalty | C: Contested | 04/16/2012 | $0.00 | 03/27/2012 | Serious | |
Penalty | Z: Issued | 03/22/2012 | $0.00 | 03/27/2012 | Serious |
Text For Citation: 01 Item/Group: 007D Hazard:
29 CFR 1910.305(b)(2): Pull boxes, junction boxes, and fittings were not provided with covers approved for the purpose: a) On or about October 29, 2011, and at times prior, Continental Resources, Inc., as the controlling employer, did not ensure that Cyclone Drilling, Inc., a subcontractor, protected their employees from injury in that, the switch box for the diesel pump supplying the mud tanks was missing a cover.