Violation Detail
Standard Cited: 19100146 D14 Permit-required confined spaces
Inspection Nr: 1199680.015
Citation: 01007C
Citation Type: Serious
Abatement Date: 02/02/2018 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 06/26/2017
Nr Instances: 1
Nr Exposed: 8
Related Event Code (REC): C
Gravity: 5
Report ID: 0215800
Contest Date: 07/09/2017
Final Order: 02/02/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 02/02/2018 | $0.00 | 02/02/2018 | Serious | |
Penalty | C: Contested | 07/26/2017 | $0.00 | 07/05/2017 | Serious | |
Penalty | Z: Issued | 06/26/2017 | $0.00 | 07/05/2017 | Serious |
Text For Citation: 01 Item/Group: 007C Hazard:
29 CFR 1910.146(d)(14): Under the permit-required confined space program required by 29 CFR 1910.146(c)(4), the employer did not review the permit-required confined space program, using the canceled permits retained under 29 CFR 1910.146(e)(6) within one year after each entry and did not revise the program as necessary, to ensure that employees participation in entry operations were protected from permit space hazards: a) Carthage Specialty Paperboard, Inc., on or about 1/23/17: Employer's written confined space program has not been reviewed and updated since 2001.