Violation Detail
Standard Cited: 19100147 D03 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1179536.015
Citation: 01007C
Citation Type: Other
Abatement Date: 02/16/2017 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 02/10/2017
Nr Instances: 8
Nr Exposed: 3
Related Event Code (REC):
Gravity:
Report ID: 0111700
Contest Date:
Final Order: 03/21/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/21/2017 | $0.00 | 02/16/2017 | Other | |
Penalty | Z: Issued | 02/10/2017 | $0.00 | 02/16/2017 | Serious |
Text For Citation: 01 Item/Group: 007C Hazard:
29 CFR 1910.147(d)(3): All energy isolating devices that are needed to control the energy to the machine or equipment was not physically located and operated in such a manner as to isolate the machine or equipment from the energy sources: Instance a. On or about September 23, 2016, an authorized employee did not verify that all energy isolation devises were located on the Top Notch ski chairlift system prior to allowing the maintenance procedures to begin. Instance b. On or about September 23, 2016, an authorized employee did not verify that all energy isolation devises were located on the Flying Yankee ski chairlift system prior to allowing the maintenance procedures to begin. Instance c. On or about September 23, 2016, an authorized employee did not verify that all energy isolation devises were located on the Summit ski chairlift system prior to allowing the maintenance procedures to begin. Instance d. On or about September 23, 2016, an authorized employee did not verify that all energy isolation devises were located on the East Borvig & West Borvig ski chairlift systems prior to allowing the maintenance procedures to begin. Instance e. On or about September 23, 2016, an authorized employee did not verify that all energy isolation devises were located on the Learning Center ski chairlift system prior to allowing the maintenance procedures to begin. Instance f. On or about September 23, 2016, an authorized employee did not verify that all energy isolation devises were located on the Abenaki ski chairlift system prior to allowing the maintenance procedures to begin. Instance g. On or about September 23, 2016, an authorized employee did not verify that all energy isolation devises were located on the Kachina ski chairlift system prior to allowing the maintenance procedures to begin. Instance h. On or about September 23, 2016, an authorized employee did not verify that all energy isolation devises were located on the Flying Bear ski chairlift system prior to allowing the maintenance procedures to begin.