Violation Detail
Standard Cited: 19100219 E01 I Mechanical power-transmission apparatus.
Inspection Nr: 449053.015
Citation: 01007B
Citation Type: Serious
Abatement Date: 08/19/2012 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/20/2012
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 1
Report ID: 0316700
Contest Date:
Final Order: 08/06/2012
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/06/2012 | $0.00 | 08/19/2012 | Serious | |
Penalty | Z: Issued | 07/20/2012 | $0.00 | 08/19/2012 | Serious |
Text For Citation: 01 Item/Group: 007B Hazard:
29 CFR 1910.219(e)(1)(i): Horizontal belts which had both runs seven feet or less from the floor level were not guarded with a guard that extended to at least fifteen inches above the belt: (a) Maintenance Shop - The two v-belts off the motor, about three feet above the floor, on the air compressor did not have guarding on the side of the belts facing the motor, on or about May 18, 2012. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and shall state that employees and their representatives were informed of this abatement.