Violation Detail
Standard Cited: 19100305 G01 IV D Wiring methods, components, and equipment for general use.
Inspection Nr: 1737893.015
Citation: 01007B
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/06/2024
Nr Instances: 2
Nr Exposed: 10
Abatement Date: 08/16/2024
Gravity: 1
Report ID: 0317700
Contest Date:
Final Order: 08/29/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/29/2024 | $0.00 | 08/16/2024 | Other | |
Penalty | Z: Issued | 08/06/2024 | $0.00 | 08/16/2024 | Serious |
Text For Citation: 01 Item/Group: 007B Hazard:
29 CFR 1910.305(g)(1)(iv)(D): Flexible cords and cables were attached to building surfaces: a) HPK Area: On or about March 28, 2024, employees were exposed to electrical hazards while working in the HPK area, due to flexible cords that were attached to building surfaces to power the exhaust fan and the spin picker. b) Rendering Room: On or about March 28, 2024, employees working in the rendering room were exposed to electrical hazards due to flexile cords that were attached to the building surface to power a 120v propane heater. Abatement certification required.