Violation Detail
Standard Cited: 19100303 C03 I General.
Inspection Nr: 1721955.015
Citation: 01007B
Citation Type: Serious
Abatement Date: 08/12/2024 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/18/2024
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 5
Report ID: 0419400
Contest Date: 08/06/2024
Final Order: 11/27/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 11/27/2024 | $0.00 | 08/12/2024 | Serious | |
Penalty | C: Contested | 10/10/2024 | $0.00 | 08/12/2024 | Serious | |
Penalty | Z: Issued | 07/18/2024 | $0.00 | 08/12/2024 | Serious |
Text For Citation: 01 Item/Group: 007B Hazard:
29 CFR 1910.303(c)(3)(i): All splices and joints and the free ends of the conductors were not covered with an insulation equivalent to that of the conductors or with an insulating device identified for the purpose. (a) Acid washroom - On or about January 25, 2024, the employer allowed an electrical repair of a power cable from the panel box to the equipment that was spliced together using black electrical tape and was not equivalent to that of 120V to 440V electrical conductors, exposing employees to electrical hazards.