Violation Detail
Standard Cited: 19100110 B09 VII B Storage and handling of liquefied petroleum gases.
Inspection Nr: 1721845.015
Citation: 01007B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,453.00
Current Penalty: $0.00
Issuance Date: 07/08/2024
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 08/12/2024
Gravity: 5
Report ID: 0627100
Contest Date:
Final Order: 07/30/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/30/2024 | $0.00 | 08/12/2024 | Serious | |
Penalty | Z: Issued | 07/08/2024 | $6,453.00 | 08/12/2024 | Serious |
Text For Citation: 01 Item/Group: 007B Hazard:
29 CFR 1910.110(b)(9)(vii)(b): For use inside buildings the hose was not of minimum practical length, but exceeded 6 feet except as provided in paragraph (c)(5)(i)(g) of this section and extended from one room to another, or passed through any walls, partitions, ceilings, or floors: a) On or about January 18, 2024, a Mr. Heater Vent-Free Liquid Propane Radiant Heater was used in a breakroom where the propane supply hose passed through an interior brick wall.