Violation Detail
Standard Cited: 19100305 B02 I Wiring methods, components, and equipment for general use.
This violation item has been deleted.
Inspection Nr: 1646335.015
Citation: 01007B
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/19/2023
Nr Instances: 1
Nr Exposed: 7
Abatement Date:
Gravity: 5
Report ID: 0521100
Contest Date: 08/09/2023
Final Order: 09/03/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 09/03/2024 | $0.00 | Serious | ||
Penalty | C: Contested | 08/10/2023 | $0.00 | Serious | ||
Penalty | Z: Issued | 07/19/2023 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 007B Hazard:
29 CFR 1910.305(b)(2)(i): All pull boxes, junction boxes, and fittings shall be provided with covers identified for the purpose. If metal covers are used, they shall be grounded. In completed installations, each outlet box shall have a cover, faceplate, or fixture canopy: On or about January 26, 2023, to January 27, 2023, at an establishment located at 2099 Badgerland Drive in Green Bay, WI, in the Effluent Room; a junction box used to power the high and low hide pump floats had the hinged cover in the open position with the live conductors protruding out of the box, exposing employees to potential electrical shock hazards.