Violation Detail
Standard Cited: 19100304 G05 Wiring design and protection.
Inspection Nr: 1406004.015
Citation: 01007B
Citation Type: Serious
Abatement Date: 07/22/2019 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/11/2019
Nr Instances: 3
Nr Exposed: 14
Related Event Code (REC):
Gravity: 5
Report ID: 0215800
Contest Date: 07/31/2019
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 07/31/2019 | $0.00 | 07/22/2019 | Serious | |
Penalty | Z: Issued | 07/11/2019 | $0.00 | 07/22/2019 | Serious |
Text For Citation: 01 Item/Group: 007B Hazard:
29 CFR 1910.304(g)(5): The path to ground from circuits, equipment, and enclosures were not permanent, continuous, and effective: a) Deli Storage Area, on or about 6/06/19: Gilbert Bug Zapper did not have a permanent, continuous and effective path to ground in that the ground pin was missing from the plug connector. b) Produce Cooler Area, on or about 6/06/09: The path to ground from circuits was not permanent, continuous and effective in that the electrical conduit leading to the light switch had voltage present. c) Shipping/Receiving Area, om or about 6/06/19: The path to ground from circuits was not permanent, continuous and effective in that the electrical conduit leading to the light switch had voltage present.