Violation Detail
Standard Cited: 19100305 G01 IV B Wiring methods, components, and equipment for general use.
Inspection Nr: 1288984.015
Citation: 01007B
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/02/2018
Nr Instances: 2
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0419700
Contest Date: 07/24/2018
Final Order: 05/17/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 05/17/2019 | $0.00 | Serious | ||
Penalty | C: Contested | 07/30/2018 | $0.00 | Serious | ||
Penalty | Z: Issued | 07/02/2018 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 007B Hazard:
29 CFR 1910.305(g)(1)(iv)(B): Flexible cords and/or cables were run through holes in walls, ceilings, or floors: a. On or about January 21, 2018, on the southeast side of the fabrication shop, the flexible cord entering the employees gang box was not protected, exposing employees to an electrical shock hazard. b. On or about January 21, 2018, on the southwest side of the fabrication shop, the flexible cord entering the employees gang box was not protected, exposing employees to an electrical shock hazard.