Violation Detail
Standard Cited: 19100303 B02 General.
This violation item has been deleted.
Inspection Nr: 1060104.015
Citation: 01007B
Citation Type: Serious
Abatement Status:
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/29/2015
Nr Instances: 2
Nr Exposed: 20
Abatement Date: 11/25/2015
Gravity: 1
Report ID: 0522300
Contest Date: 11/06/2015
Final Order: 09/26/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 09/26/2016 | $0.00 | 11/25/2015 | Serious | |
Penalty | C: Contested | 11/12/2015 | $0.00 | 11/25/2015 | Serious | |
Penalty | Z: Issued | 10/29/2015 | $0.00 | 11/25/2015 | Serious |
Text For Citation: 01 Item/Group: 007B Hazard:
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling: (a) On or about 05/06/2015, a re-locatable power strip located in C-Building, Metal Cut Saw area, was used in lieu of permanent wiring. A portable radio was plugged into it. (b) On or about 06/02/2015, the switch(es) used for turning on and off the Adams 3 speed flame was not designed to prevent unintentional restarting of the machinery and/or constructed and mounted to minimize inadvertent operation.