Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 999915.015
Citation: 01007A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,400.00
Current Penalty: $3,240.00
Issuance Date: 04/07/2015
Nr Instances: 2
Nr Exposed: 30
Abatement Date: 04/24/2015
Gravity: 5
Report ID: 0524200
Contest Date: 05/08/2015
Final Order: 08/31/2015
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 08/31/2015 | $3,240.00 | 04/24/2015 | Serious | |
Penalty | C: Contested | 05/15/2015 | $5,400.00 | 04/24/2015 | Serious | |
Penalty | Z: Issued | 04/07/2015 | $5,400.00 | 04/24/2015 | Serious |
Text For Citation: 01 Item/Group: 007A Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: a) Machine Shop - Exit route door facing Pulaski Road, employees were not able to open the exit route door from the inside at all times without keys, tools or special knowledge. b) Lathes Department - Exit route door facing the west alley, employees were not able to open an exit route door from the inside at all times without keys, tools or special knowledge.