Violation Detail
Standard Cited: 19100107 C02 Spray finishing using flammable and combustible materials.
Inspection Nr: 998870.015
Citation: 01007A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,000.00
Current Penalty: $3,500.00
Issuance Date: 03/17/2015
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 04/08/2015
Gravity: 5
Report ID: 0627700
Contest Date:
Final Order: 04/14/2015
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/14/2015 | $3,500.00 | 04/08/2015 | Serious | |
| Penalty | Z: Issued | 03/17/2015 | $5,000.00 | 04/08/2015 | Serious |
Text For Citation: 01 Item/Group: 007A Hazard:
29 CFR 1910.107(c)(2): Open flame or spark producing equipment was within a spraying area and/or within 20 feet thereof, was not separated by a partition: a. On or about October 15, 2014, paint building, an employee worked from the platform of a diesel powered extensible boom lift to spray the top of a change house with coating (flammable liquid) mixed with converter (flammable liquid) which exposes employees to fire and explosion hazards.
Translate