Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
Inspection Nr: 313797292
Citation: 01007A
Citation Type: Serious
Abatement Status: X
Initial Penalty: $4,200.00
Current Penalty: $2,500.00
Issuance Date: 08/19/2010
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 11/03/2010
Gravity: 10
Report ID: 0111400
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/10/2010 | $2,500.00 | 11/03/2010 | Serious | |
| Penalty | Z: Issued | 08/19/2010 | $4,200.00 | 10/05/2010 | Serious |
Text For Citation: 01 Item/Group: 007A Hazard: CHEMNEP
29 CFR 1910.119(j)(2): The employer did not establish and implement written procedures to maintain the on-going mechanical integrity of process equipment: Facility: The employer did not develop and implement written mechanical integrity procedures to maintain the on-going mechanical integrity of process equipment including, but not limited to: 1)Skid mounted system containing recycle pumps, tanks, piping, instrumentation and PLC controls 2)Remote Mounted Motor Control Center 3)Marley Cooling Tower and associated motors, pumps, tanks, and level control 4)30 SCFM 10 HP chlorine tank car padding unit 5)Provent Chlorine Scrubber 6)Chlorine tank car unloading system 7)Unipro shutoff system equipment 8)Pressure relief valves 9)Chlorine gas detectorse