Violation Detail
Standard Cited: 19100304 B03 II C 3 Wiring design and protection.
Inspection Nr: 1686156.015
Citation: 01007A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,692.00
Current Penalty: $5,692.00
Issuance Date: 11/02/2023
Nr Instances: 2
Nr Exposed: 2
Abatement Date: 11/30/2023
Gravity: 1
Report ID: 0111100
Contest Date:
Final Order: 11/21/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/21/2023 | $5,692.00 | 11/30/2023 | Serious | |
Penalty | Z: Issued | 11/02/2023 | $5,692.00 | 11/30/2023 | Serious |
Text For Citation: 01 Item/Group: 007A Hazard:
29 CFR 1910.304(b)(3)(ii)(C)(3): Each cord set, attachment cap, plug, and receptacle of cord sets, and any equipment connected by cord and plug, was not visually inspected before each day's use for external defects, such as deformed or missing pins or insulation damage, and for indications of possible internal damage: Establishment - Employer failed to complete inspections of power cords to note defects in the following areas: a. The employer failed to inspect an electrical power strip with damaged insulation in the cutting edge welding booth to power a grinder, fan, extension cord, lights prior to operation. b. The employer failed to inspect a light with damaged insulation on the power cord adjacent to yellow powder coat line prior to operation.