Violation Detail
Standard Cited: 19100305 B01 I Wiring methods, components, and equipment for general use.
Inspection Nr: 1646335.015
Citation: 01007A
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $12,278.00
Current Penalty: $10,390.00
Issuance Date: 07/19/2023
Nr Instances: 1
Nr Exposed: 12
Abatement Date:
Gravity: 5
Report ID: 0521100
Contest Date: 08/09/2023
Final Order: 09/03/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 09/03/2024 | $10,390.00 | Serious | ||
Penalty | C: Contested | 08/10/2023 | $12,278.00 | Serious | ||
Penalty | Z: Issued | 07/19/2023 | $12,278.00 | Serious |
Text For Citation: 01 Item/Group: 007A Hazard:
29 CFR 1910.305(b)(1)(i): Conductors entering cutout boxes, cabinets, or fittings shall be protected from abrasion, and openings through which conductors enter shall be effectively closed: On or about February 7, 2023, at an establishment located at 2099 Badgerland Drive in Green Bay, WI, outside of the Bliss Room, to the right of the pedestrian door on the east side; the flexible conduit housing the electrical wires to power Bucket Elevator (B.E.) #2 feed conveyor was broken and open at the connection fitting, exposing the conductors to abrasion.