Violation Detail
Standard Cited: 19100305 B01 II Wiring methods, components, and equipment for general use.
Inspection Nr: 1629310.015
Citation: 01007A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,822.00
Current Penalty: $15,000.00
Issuance Date: 04/14/2023
Nr Instances: 1
Nr Exposed: 15
Abatement Date: 08/01/2023
Gravity: 5
Report ID: 0316700
Contest Date:
Final Order: 05/10/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/10/2023 | $15,000.00 | 08/01/2023 | Serious | |
Penalty | Z: Issued | 04/14/2023 | $9,822.00 | 05/04/2023 | Serious |
Text For Citation: 01 Item/Group: 007A Hazard:
29 CFR 1910.305(b)(1)(ii): Unused openings in boxes, cabinets, or fittings were not effectively closed: a. Meltshop E8389 Load Center - The electrical E8389 cabinet had a 2" unused opening which was immediately above the dry breaker box and exposed employees to an electrical hazard. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.