Violation Detail
Standard Cited: 19100253 C01 V Oxygen-fuel gas welding and cutting.
Inspection Nr: 1454689.015
Citation: 01007A
Citation Type: Serious
Abatement Date: 08/04/2020 4
Initial Penalty: $9,446.00
Current Penalty: $4,723.00
Issuance Date: 07/06/2020
Nr Instances: 2
Nr Exposed: 4
Related Event Code (REC):
Gravity: 10
Report ID: 0419400
Contest Date:
Final Order: 08/03/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/03/2020 | $4,723.00 | 08/04/2020 | Serious | |
Penalty | Z: Issued | 07/06/2020 | $9,446.00 | 08/04/2020 | Serious |
Text For Citation: 01 Item/Group: 007A Hazard:
29 CFR 1910.253(c)(1)(v): High pressure fuel-gas manifolds were not provided with approved pressure regulating devices: (a) Lower Tank Shop - On or about January 8, 2020 the employer ensure a dual, high pressure fuel gas manifold on the LPG line was correct and/or operating properly, exposing the employees to fire and explosion hazards.