Violation Detail
Standard Cited: 19100303 B02 General.
Inspection Nr: 1228075.015
Citation: 01007A
Citation Type: Serious
Abatement Date: 10/25/2017 2
Initial Penalty: $7,967.00
Current Penalty: $5,000.00
Issuance Date: 10/23/2017
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0627700
Contest Date: 12/04/2017
Final Order: 08/23/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 08/23/2018 | $5,000.00 | 10/25/2017 | Serious | |
Penalty | C: Contested | 12/11/2017 | $7,967.00 | 10/25/2017 | Serious | |
Penalty | Z: Issued | 10/23/2017 | $7,967.00 | 10/25/2017 | Serious |
Text For Citation: 01 Item/Group: 007A Hazard:
29 CFR 1910.303(b)(2): Listed or labeled equipment was not used or installed in accordance with any instructions included in the listing or labeling The employer does not ensure a relocatable power was not directly connected to a permanent branch circuit receptacle. This violation was observed was on or about April 26, 2017 in the south lean-to bay area, exposing employees to the electrical hazards.