Violation Detail
Standard Cited: 19261203 H04 I
Inspection Nr: 1102251.015
Citation: 01007A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,800.00
Current Penalty: $1,400.00
Issuance Date: 04/11/2016
Nr Instances: 3
Nr Exposed: 3
Abatement Date: 08/08/2016
Gravity: 10
Report ID: 0524500
Contest Date: 04/28/2016
Final Order: 10/13/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 10/13/2016 | $1,400.00 | 08/08/2016 | Serious | |
Penalty | C: Contested | 05/02/2016 | $2,800.00 | 05/05/2016 | Serious | |
Penalty | Z: Issued | 04/11/2016 | $2,800.00 | 05/05/2016 | Serious |
Text For Citation: 01 Item/Group: 007A Hazard:
29 CFR 1926.1203(h(4)(i): The controlling contractor and entry employer(s) did not coordinate entry operations when more than one entity performs permit space entry at the same time: On or about October 16, 19 and 20, 2015, employees entered confined spaces between the secondary clarifier diversion structure, post aeration building and the diversion structure and the employer and controlling contractor did not coordinate entry operations when more than one entity performs permit space entry at the same time.