Violation Detail
Standard Cited: 19100179 B05 Overhead and gantry cranes.
Inspection Nr: 910135.015
Citation: 01007
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,000.00
Current Penalty: $3,500.00
Issuance Date: 11/07/2013
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 11/20/2013
Gravity: 5
Report ID: 0626300
Contest Date:
Final Order: 12/26/2013
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/26/2013 | $3,500.00 | 11/20/2013 | Serious | |
| Penalty | Z: Issued | 11/07/2013 | $5,000.00 | 11/20/2013 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.179(b)(5): The rated load of the crane was not plainly marked on each side of the crane, and if the crane has more than one hoisting unit, each hoist did not have its rated load marked on it or its load block and this marking was not clearly legible from the ground or floor: The employer does not ensure that the rated load of cranes are plainly marked on each side of the cranes and legible from the ground or floor. This violation was discovered on June 6, 2013, where the employer did not ensure that the rated load of a Jib crane was plainly marked on each side of the crane.