Violation Detail
Standard Cited: 19100119 E05 Process safety management of highly hazardous chemicals.
Inspection Nr: 908983.015
Citation: 01007
Citation Type: Serious
Abatement Date: 02/13/2014 2
Initial Penalty: $2,800.00
Current Penalty: $1,820.00
Issuance Date: 11/27/2013
Nr Instances: 2
Nr Exposed: 13
Related Event Code (REC):
Gravity: 10
Report ID: 0214200
Contest Date: 12/16/2013
Final Order: 04/24/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/24/2014 | $1,820.00 | 02/13/2014 | Serious | |
Penalty | C: Contested | 12/18/2013 | $2,800.00 | 01/16/2014 | Serious | |
Penalty | Z: Issued | 11/27/2013 | $2,800.00 | 01/16/2014 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.119(e)(5): The employer did not establish a system to assure that the recommendations were resolved in a timely manner and that the resolution was documented: a) Establishment - PHA A 2007 PHA line 1.24 action item was to update P&IDs with piping specifications. The current P&IDs do not include piping specifications. b) Establishment - PHA A 2007 PHA line 1.7 action item was to update P&ID sheet #B02 to reflect correctly PRV 113 pressure setting of 20 PSIG. The P&ID currently has PRV 113 labeled with a pressure setting of 15 PSIG. Violation observed on or about 5/30/13.