Violation Detail
Standard Cited: 19100253 E05 III Oxygen-fuel gas welding and cutting.
Inspection Nr: 668198.015
Citation: 01007
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,000.00
Current Penalty: $2,125.00
Issuance Date: 02/19/2013
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 04/05/2013
Gravity: 5
Report ID: 0419700
Contest Date:
Final Order: 03/06/2013
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/06/2013 | $2,125.00 | 04/05/2013 | Serious | |
| Penalty | Z: Issued | 02/19/2013 | $4,000.00 | 04/05/2013 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.253(e)(5)(iii): Hose connections did not comply with the Standard Hose Connection Specifications, 1957, Compressed Gas Association: a. On or about October 1, 2012, in the maintenance shed near the asphalt manufacturing area, the oxygen acetylene set had water hose clamps on the gas lines, exposing employees to explosive hazards.
Translate