Violation Detail

Standard Cited: 19260451 F06 General requirements.

Inspection Nr: 423123.015

Citation: 01007

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $7,000.00

Current Penalty: $3,500.00

Issuance Date: 10/29/2012

Nr Instances: 1

Nr Exposed: 5

Abatement Date: 10/30/2012

Gravity: 10

Report ID: 0317000

Contest Date:

Final Order: 11/15/2012

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 11/15/2012 $3,500.00 10/30/2012 Serious  
Penalty Z: Issued 10/29/2012 $7,000.00 10/30/2012 Serious  

Text For Citation: 01 Item/Group: 007 Hazard:

29 CFR 1926.451(f)(6): The clearance between scaffolds and power lines shall be as follows: Scaffolds shall not be erected, used, dismantled, altered, or moved such that they or any conductive material handled on them might come closer to exposed and energized power lines. a) Jobsite - 2000 Parrish Street - The clearance between the tubular welded scaffold and the energized power line was less than 10 feet. An employee contacted an energized line while hoisting a bucket of mortar mix on or about 4/30/12.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.