Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 314927559
Citation: 01007
Citation Type: Serious
Abatement Status:
Initial Penalty: $5,000.00
Current Penalty: $5,000.00
Issuance Date: 03/14/2011
Nr Instances: 6
Nr Exposed: 191
Abatement Date: 04/16/2011
Gravity: 10
Report ID: 0627700
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/24/2011 | $5,000.00 | 04/16/2011 | Serious | |
Penalty | Z: Issued | 03/14/2011 | $5,000.00 | 04/16/2011 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard: REFINERY
29 CFR 1910.119(j)(2): The employer did not establish and implement written procedures to maintain the on-going mechanical integrity of process equipment: On or about September 14, 2010, and at times prior thereto, the employer did not establish and/or implement written procedures for the on-going mechanical integrity of equipment such as, but not limited to: a)The mechanical integrity program procedures for pressure vessels and for process piping did not clearly set the specific number and locations of thickness measurement locations (TMLs) for each of its pressure vessels and sections of piping. b)The employer's mechanical integrity procedure did not address anomalous inspection data such as increasing TML values for pressure vessels including, but not limited to: 1) #2 Platformer Unit: TRPV12 374 Depentanizer (Rerun) Tower 2) #2 Platformer Unit: R-PV2 374 Reactor2 3) Unifiner Unit: E-104D 373 Reactor Product Condenser 4) Unifiner Unit: R-HV3 373 Unifining Reactor 5) Butane Splitter Unit: D-AV20383 Depropanizer Charge Drumge