Violation Detail
Standard Cited: 19100119 L01 Process safety management of highly hazardous chemicals.
Inspection Nr: 311813919
Citation: 01007
Citation Type: Serious
Abatement Status: X
Initial Penalty: $5,500.00
Current Penalty: $3,850.00
Issuance Date: 09/13/2012
Nr Instances: 1
Nr Exposed: 27
Abatement Date: 10/09/2012
Gravity: 05
Report ID: 0317300
Contest Date: 10/04/2012
Final Order: 09/21/2013
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 09/21/2013 | $3,850.00 | 10/09/2012 | Serious | |
| Penalty | Z: Issued | 09/13/2012 | $5,500.00 | 10/09/2012 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard: CHEMNEP
29 CFR 1910.119(l)(1): The employer did not establish and implement written procedures to manage changes to process technology and equipment that affect a covered process: a) E2 and S2 Reactor Units - Management of change procedures were not used for changes made by McFoy Refrigeration Inc. such as, but not limited to, programming the control system software as it relates to HVAC ventilation in the E2 Control Room and the installation of a manual emergency damper switch for the S2 Control Room. On or about August 22, 2012.