Violation Detail
Standard Cited: 19100119 E03 V Process safety management of highly hazardous chemicals.
Inspection Nr: 1787199.015
Citation: 01007
Citation Type: Serious
Abatement Status:
Initial Penalty: $8,276.00
Current Penalty: $8,276.00
Issuance Date: 05/08/2025
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 06/26/2025
Gravity: 5
Report ID: 0316700
Contest Date: 06/03/2025
Final Order:
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 06/10/2025 | $8,276.00 | 06/26/2025 | Serious | |
Penalty | Z: Issued | 05/08/2025 | $8,276.00 | 06/26/2025 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.119(e)(3)(v): The process hazard analysis did not address facility siting. a. Tank Farm Piping Circuits PHA - On or about November 12, 2024, the employer failed to ensure the PHA addressed the hazards of flame impingement and fire protection of piping systems which are minimally spaced within the PHA facility siting, the piping circuits transporting flammable liquids alongside the pipes transporting aerosol propellent. Failure to address the proximal effects of conveying flammable liquids alongside propellent gases can result in fire and explosion hazards. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.