Violation Detail
Standard Cited: 19100305 B02 I Wiring methods, components, and equipment for general use.
Inspection Nr: 1766015.015
Citation: 01007
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $13,005.00
Current Penalty: $6,502.50
Issuance Date: 01/24/2025
Nr Instances: 2
Nr Exposed: 3
Abatement Date:
Gravity: 5
Report ID: 0626300
Contest Date:
Final Order: 03/03/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/03/2025 | $6,502.50 | Serious | ||
Penalty | Z: Issued | 01/24/2025 | $13,005.00 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.305(b)(2)(i): Pull boxes, junction boxes, and fittings were not provided with covers approved for the purpose: On or about July 31, 2024, employees were not protected from electrical shock in that: (a) On shear machine 2 (marked SM1) in the shear area, there was an electrical box with a cover, but it was not attached and electrical wiring powered at approximately 240 Volt was within it. (b) On Gogan line 1, at the end of the frame to the squeezer/side taper machine, there was an electrical junction box with no cover on it and wiring in it was powered at approximately 120 Volt.