Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1726638.015
Citation: 01007
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $15,970.00
Current Penalty: $12,776.00
Issuance Date: 08/06/2024
Nr Instances: 2
Nr Exposed: 4
Abatement Date: 08/30/2024
Gravity: 10
Report ID: 0626300
Contest Date:
Final Order: 08/15/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/15/2024 | $12,776.00 | 08/30/2024 | Serious | |
Penalty | Z: Issued | 08/06/2024 | $15,970.00 | 08/30/2024 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.147(c)(4)(ii): Procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29 CFR 1910.147(c)(4)(ii)(A), (c)(4)(ii)(B), (c)(4)(ii)(C) and (c)(4)(ii)(D): a) On or about February 6, 2024, and at times prior thereto and at times thereafter, the energy control procedures for the equipment in the notcher building did not outline the scope, purpose, authorization, rules, and techniques for the control hazardous energy sources on the equipment: a) West Plains Notcher (green notcher); and b) Bob Hanna notcher (red notcher).