Violation Detail
Standard Cited: 19100178 L02 II Powered industrial trucks.
Inspection Nr: 1681286.015
Citation: 01007
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,376.00
Current Penalty: $5,284.03
Issuance Date: 12/13/2023
Nr Instances: 1
Nr Exposed: 80
Abatement Date: 01/02/2024
Gravity: 5
Report ID: 0214500
Contest Date: 01/31/2024
Final Order: 12/20/2024
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 12/20/2024 | $5,284.03 | 01/02/2024 | Serious | |
| Penalty | C: Contested | 02/01/2024 | $9,376.00 | 01/02/2024 | Serious | |
| Penalty | Z: Issued | 12/13/2023 | $9,376.00 | 01/02/2024 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.178(l)(2)(ii): The employer did not ensure that each operator had successfully completed the training consisting of a combination of formal instruction (e.g., lecture, discussion, interactive computer learning, video tape, written material), practical training (demonstrations performed by the trainer and practical exercises performed by the trainee), and evaluation of the operator's performance in the workplace. a) 1 Raritan Rd., Oakland NJ - Throughout Warehouse: The training of several operators of Propane fueled PITs and Electric PIT did not include lecture, written material, demonstrations performed by the trainer, practical exercises and evaluation of the operator's performance, on or about 7/5/23.
Translate