Violation Detail
Standard Cited: 19100303 B02 General.
Inspection Nr: 1486500.015
Citation: 01007
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $5,205.00
Current Penalty: $2,602.50
Issuance Date: 08/17/2020
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 1
Report ID: 0729700
Contest Date:
Final Order: 09/10/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/10/2020 | $2,602.50 | Serious | ||
Penalty | Z: Issued | 08/17/2020 | $5,205.00 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling: In the Maintenance Shop, employees were exposed to fire and electrical hazards from a surge suppressor was plugged into another surge suppressor on a work bench providing power to microwave, chargers and a fan.