Standard Cited: 19100304 G05 Wiring design and protection.
Inspection Nr: 1427264.015
Citation: 01007
Citation Type: Serious
Abatement Date: 03/09/2020 2
Initial Penalty: $5,783.00
Current Penalty: $3,299.90
Issuance Date: 02/25/2020
Nr Instances: 2
Nr Exposed: 2
Related Event Code (REC):
Gravity: 1
Report ID: 0215800
Contest Date: 03/19/2020
Final Order: 11/30/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 11/30/2020 | $3,299.90 | 03/09/2020 | Serious | |
Penalty | C: Contested | 03/20/2020 | $5,783.00 | 03/09/2020 | Serious | |
Penalty | Z: Issued | 02/25/2020 | $5,783.00 | 03/09/2020 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.304(g)(5): The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective: a. At the blanket ironing area, on or about 9/5/2019: An air circulating fan did not have a path to ground which was permanent and continuous in that the power cord was missing its ground pin. b. In the maintenance room, on or about 9/5/2019: A DeWalt pedestal grinder did not have a path to ground which was permanent and continuous in that the power cord was missing its ground pin. Abatement certification must be submitted for these items.