Violation Detail
Standard Cited: 19100107 B05 I Spray finishing using flammable and combustible materials.
Inspection Nr: 1352493.015
Citation: 01007
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $3,789.00
Current Penalty: $2,046.00
Issuance Date: 02/21/2019
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 10/17/2022
Gravity: 5
Report ID: 0214200
Contest Date: 04/29/2019
Final Order: 10/12/2022
Related Event Code (REC): C
Emphasis:
Substance: 1730
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 10/12/2022 | $2,046.00 | 10/17/2022 | Other | |
| Penalty | C: Contested | 05/02/2019 | $3,789.00 | 04/10/2019 | Serious | |
| Penalty | Z: Issued | 02/21/2019 | $3,789.00 | 04/10/2019 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.107(b)(5)(i): There were no visible gauges, audible alarms or pressure activated devices installed in paint spray booths to indicate or ensure that the required air speed was maintained. The average air speed over the open face of the paint spray booth was less than 100 linear feet per minute: a) Spray Booth There were no visible gauges, audible alarms or pressure activated devices installed on the spray booth used by employees who apply acrylic, lacquer and urethane and also use paint stripper containing 75-80% methylene chloride so as to indicate/ensure air velocity was maintained. The air velocity averaged 68 fpm and 55 fpm. Violation observed on or about 10/10/2018 and 12/3/2018.