Violation Detail
Standard Cited: 19100119 J05 Process safety management of highly hazardous chemicals.
Inspection Nr: 1349019.015
Citation: 01007
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,472.00
Current Penalty: $9,472.00
Issuance Date: 03/25/2019
Nr Instances: 2
Nr Exposed: 7
Abatement Date: 05/10/2019
Gravity: 5
Report ID: 0214200
Contest Date: 04/15/2019
Final Order: 05/07/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 05/07/2020 | $9,472.00 | 05/10/2019 | Serious | |
Penalty | C: Contested | 04/17/2019 | $9,472.00 | 05/10/2019 | Serious | |
Penalty | Z: Issued | 03/25/2019 | $9,472.00 | 05/10/2019 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.119(j)(5): The employer did not correct deficiencies in equipment that are outside acceptable limits (defined by the process safety information in paragraph (d) of this section) before further use or in a safe and timely manner when necessary means are taken to assure safe operation: Facility, 436 Doremus Avenue, Newark, NJ a) The pentane blending process operated with equipment deficiencies, including but not limited to a missing FRP shoe between piping and unistrut brace at off load area. b) The pentane blending process operated with equipment deficiencies, including but not limited to unsupported process piping north of CML-10. Violation occurred on or about 9-26-18