Violation Detail
Standard Cited: 19100219 F03 Mechanical power-transmission apparatus.
Inspection Nr: 1321634.015
Citation: 01007
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,691.00
Current Penalty: $3,414.60
Issuance Date: 08/07/2018
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 08/17/2018
Gravity: 5
Report ID: 0215800
Contest Date:
Final Order: 09/06/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/06/2018 | $3,414.60 | 08/17/2018 | Serious | |
Penalty | Z: Issued | 08/07/2018 | $5,691.00 | 08/17/2018 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.219(f)(3): Sprocket wheels and chains which were seven -7 feet or less above floors or platforms were not enclosed: a) On or about 6/13/2018, Saw Mill: The pinch point created by a chain and sprockets located at the splitter were not guarded. Abatement certification is required for these items.