Violation Detail
Standard Cited: 19100119 J04 III Process safety management of highly hazardous chemicals.
Inspection Nr: 1277754.015
Citation: 01007
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $10,477.00
Current Penalty: $6,286.00
Issuance Date: 05/14/2018
Nr Instances: 6
Nr Exposed: 4
Abatement Date: 06/01/2018
Gravity: 10
Report ID: 0626600
Contest Date:
Final Order: 06/07/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/07/2018 | $6,286.00 | 06/01/2018 | Serious | |
Penalty | Z: Issued | 05/14/2018 | $10,477.00 | 06/01/2018 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.119(j)(4)(iii): The employer did not ensure that the frequency of inspections and tests of process equipment was consistent with applicable manufacturers' recommendations and good engineering practices, and more frequently if determined to be necessary by prior operating experience. On or about November 14, 2017 the employer did not ensure that frequency of inspection and testing of equipment in the process complied with recognized and generally accepted good engineering practices {RAGAGEP}, such as, but limited to, Chlorine Institute Pamphlet 85, Appendix 2, Piping Systems and Components, and American Petroleum Institute 570 (2018), Section 6, Interval/Frequency and Extent of Inspection for piping inspection frequency for the following equipment: a) Pipeline 1 CL-201-CS1 to 2-CL-201-CS1 injection into Powell Unit b) Pipeline 1 CL-219-GCS1