Violation Detail
Standard Cited: 19100303 B02 General.
Inspection Nr: 1245028.015
Citation: 01007
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $4,346.00
Current Penalty: $2,390.00
Issuance Date: 12/11/2017
Nr Instances: 3
Nr Exposed: 9
Abatement Date:
Gravity: 5
Report ID: 0524200
Contest Date:
Final Order: 01/05/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/05/2018 | $2,390.00 | Serious | ||
Penalty | Z: Issued | 12/11/2017 | $4,346.00 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling: a) Production Area- On or about July 7, 2017, the employer failed to ensure that temporary wiring extension cords were not used in conjunction with other temporary wiring extension cords or relocatable power tap devices on Lines 2, 4 and 6. These cords powered fans, motor blowers, and water pumps. No abatement certification or documentation is required for this item.