Violation Detail
Standard Cited: 19100179 L03 I Overhead and gantry cranes.
Inspection Nr: 1229034.015
Citation: 01007
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $12,675.00
Current Penalty: $4,125.00
Issuance Date: 10/31/2017
Nr Instances: 6
Nr Exposed: 10
Abatement Date: 09/25/2018
Gravity: 10
Report ID: 0418100
Contest Date: 11/23/2017
Final Order: 09/04/2018
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 09/04/2018 | $4,125.00 | 09/25/2018 | Serious | |
| Penalty | C: Contested | 12/13/2017 | $12,675.00 | 12/19/2017 | Serious | |
| Penalty | Z: Issued | 10/31/2017 | $12,675.00 | 12/19/2017 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.179(l)(3)(i): Unsafe condition(s) disclosed during the frequent or periodic inspection(s) required by 29 CFR 1910.179(j) were not corrected before operation of the crane(s) was resumed. On 5/2/17, at the Buford facility, the employer did not ensure adjustments and repairs were made to cranes after the periodic inspection performed in 10/2016 indicated the company needed to do so. Deficiencies included: a- Limit switches needing adjustments b- Runway rails having loose, missing or deteriorated rivets and needing immediate attention c- Wire rope showing excessive wear d- Damaged end stops e- J bolts are loose and able to be turned by hand f- Key stock on shaft loose (on Trolley drive shaft) g- Hooks were found to be in use without safety latches at the following locations: USi press and Stamtec press