Violation Detail
Standard Cited: 19100219 C03 Mechanical power-transmission apparatus.
Inspection Nr: 1225855.015
Citation: 01007
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,696.00
Current Penalty: $8,944.80
Issuance Date: 09/11/2017
Nr Instances: 3
Nr Exposed: 5
Abatement Date: 02/25/2019
Gravity: 5
Report ID: 0524500
Contest Date: 09/20/2017
Final Order: 01/28/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 01/28/2019 | $8,944.80 | 02/25/2019 | Serious | |
Penalty | C: Contested | 10/27/2017 | $7,696.00 | 10/03/2017 | Serious | |
Penalty | Z: Issued | 09/11/2017 | $7,696.00 | 10/03/2017 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.219(c)(3): Vertical or inclined shafting seven (7) feet or less from floor or working platform, except maintenance runways, was not enclosed with a stationary casing in accordance with requirements of paragraphs (m) and (o) of this section: On or about April 20th, in the Boiler Room, maintenance employees were exposed to injuries when servicing the Lightnin Mixers due to the lack of guarding on the vertical rotating shafts.