Violation Detail
Standard Cited: 19100253 B04 III Oxygen-fuel gas welding and cutting.
Inspection Nr: 1217984.015
Citation: 01007
Citation Type: Other
Abatement Date: 3
Initial Penalty: $4,617.00
Current Penalty: $0.00
Issuance Date: 04/06/2017
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity:
Report ID: 0936100
Contest Date:
Final Order: 04/26/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/26/2017 | $0.00 | Other | ||
Penalty | Z: Issued | 04/06/2017 | $4,617.00 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.253(b)(4)(iii): Oxygen cylinders in storage did not separate from fuel-gas cylinders, a minimum distance of 20 feet (6.1 m) or by a noncombustible barrier at least 5 feet (1.5 m) high having a fire-resistance rating of at least one-half hour. Maintenance Building: Oxygen and fuel gases were stored together inside a yellow metal cage.