Violation Detail
Standard Cited: 19100303 G01 VII A 2 General.
This violation item has been deleted.
Inspection Nr: 1214986.015
Citation: 01007
Citation Type: Serious
Abatement Date: 09/05/2017
Initial Penalty: $8,465.00
Current Penalty: $0.00
Issuance Date: 08/09/2017
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): C
Gravity: 5
Report ID: 0418100
Contest Date:
Final Order: 08/25/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/25/2017 | $0.00 | 09/05/2017 | Serious | |
Penalty | Z: Issued | 08/09/2017 | $8,465.00 | 09/05/2017 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.303(g)(1)(vii)(A)(2): The area from the top of the electric equipment to the structure ceiling and the space equal to the width and depth of the equipment was not kept clear of foreign systems nor was protection provided to avoid damage from condensation, leaks, or breaks in such foreign systems. On or about March 2, 2017, employees were exposed to electrical hazards when the 480 volt switch gear panels were not protected from water from the sprinkler line that was mounted on the wall above the switch gear panels. The switch gear panels were located beside the employee entrance door (near press 103). In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).