Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
Inspection Nr: 1182966.015
Citation: 01007
Citation Type: Serious
Abatement Date: 05/04/2017 2
Initial Penalty: $6,338.00
Current Penalty: $5,350.00
Issuance Date: 04/10/2017
Nr Instances: 1
Nr Exposed: 11
Related Event Code (REC):
Gravity: 5
Report ID: 0213900
Contest Date: 05/01/2017
Final Order: 05/31/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 05/31/2018 | $5,350.00 | 05/04/2017 | Serious | |
Penalty | C: Contested | 05/04/2017 | $6,338.00 | 05/04/2017 | Serious | |
Penalty | Z: Issued | 04/10/2017 | $6,338.00 | 05/04/2017 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.119(j)(2): The employer did not establish written procedures to maintain the on-going integrity of process equipment: a) Epoxy manufacturing and monomers process: On or about 10/11/2016, the employer did not establish written inspection procedures for the cooling water valves and actuators for process reactors R105 and R106, on or about 10/11/2016. NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.