Violation Detail
Standard Cited: 19100303 F02 General.
Inspection Nr: 1109943.015
Citation: 01007
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,000.00
Current Penalty: $3,000.00
Issuance Date: 03/28/2016
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 04/11/2016
Gravity: 5
Report ID: 0626600
Contest Date:
Final Order: 04/18/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/18/2016 | $3,000.00 | 04/11/2016 | Serious | |
Penalty | Z: Issued | 03/28/2016 | $5,000.00 | 04/11/2016 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.303(f)(2): Each service, feeder, and branch circuit, at its disconnecting means or overcurrent device, was not legibly marked to indicate its purpose, nor located and arranged so the purpose was evident: Located in the greenhouse where employees were exposed to electrical and fire hazards when a breaker panel with breakers powering greenhouse and shade house lights was not labeled.